SR/11 Otay Mesa East Port of Entry
SRK Engineering is proud to work with Skanska on this momentous project to alleviate border congestion.
Work Completed:
Installation of extensive storm drain package which included the excavation, lay and slurry backfill of over 25,000 linear feet of storm drain pipe from 18-inch up to 72-inch. SRK also performed the removal and disposal of just under 1,000 feet of asbestos CMLC. In addition, installation of site utilities for the Caltrans field office facility off of Route 905 in Caliente.